AVERAGE NUMBER OF MACHINE SET-UPS PER DAY:
AVERAGE CURRENT TIME (IN MINUTES) SPENT ON EACH SET-UP:
PROJECTED TIME (IN MINUTES) WITH BALL LOCK™ SYSTEM:
AVERAGE TIME (IN MINUTES) SAVED PER SET-UP:
AVERAGE HOURLY MACHINE RATE:
AVERAGE MACHINE RATE PER MINUTE:
TOTAL DAILY SET-UP COST BEFORE USING BALL LOCK:
TOTAL PROJECTED DAILY SET-UP COST AFTER USING BALL LOCK:
TOTAL PROJECTED SAVINGS PER DAY:
TOTAL MACHINE CAPACITY (MINUTES) ENHANCEMENT PER DAY:
AVERAGE MACHINE CAPACITY VALUE ADDED PER DAY:
TOTAL EST. ANNUAL MACH. CAPACITY VALUE ADDED (250 DAYS):
AVERAGE ANNUAL SET-UP SAVINGS (BASED ON 250 WORK DAYS):
TOTAL ESTIMATED ANNUAL SAVINGS: